The floating docking platform is a multifunctional vessel developed by Safe Shipyard from Gdańsk. The advantages and possibilities of this project were discussed by a wide audience during the conference "New opportunities for marine hydrotechnical construction, offshore and shipbuilding industry".
Not always one has an opportunity to
gather everyone involved in the investment process in one place, but
the conference was one of this rare cases. Among the guests there
were also potential investors, i.e. representatives of the Maritime
Office, ports, as well as potential general contractors.
Stocznia
Safe and the GospodarkaMorska.pl portal, the conference organizers,
also invited representatives of shipping and forwarding companies, as
well as representatives of smaller shipbuilding businesses, and
financial institutions to discuss.
- Pontoon-dock, or Floating
Docking Platform (PPD), is a unified technology for handling
large-size structures. We are talking about ships and their elements,
but also offshore structures, elements of drilling platforms or fully
equipped finished modules for the construction of industry and
energetic facilities - says Marek Siemaszko, president of Safe
Shipyard.
The Floating Docking Platform has docking and
transport functions in the water-land and land-water relationship.
The floating object docking technology developed by Safe allows, in
addition to taking the object from the water, its transport on
modular transport trolleys (SPMT), to the wharf and even to the
hall.
The PPD is also equipped with a specialized unloading
ramp adapted to quays with a low load capacity of up to 2 tons per
square meter. The side height of the pontoon (5 m) allows to pick up
cargo from virtually every wharf in the country, regardless of the
direction of the tides and the water level.
What determined
the implementation of such an idea?
- At first, we started to
think about our own needs. The reconstruction of our dock would cost
several million zlotys, and it still would not fulfill its purpose.
So we decided to build something new. And this is how the idea for
the PPD was born - says president Siemaszko.
Safe applied to
Wuprohyd for an analysis of the possibility of using a pontoon-dock
for the implementation of hydrotechnical structures planned in the
near future in Poland.
- We see great potential in the PPD, it
can be used in many ways. This is a potential benefit for Polish or
foreign contractors to use the product of the Polish shipyard, while
implementing the idea of local content, reduce costs and shorten
working time - analyzed Piotr Pawłowski, member of the Wuprohyd
management board.
New technologies will facilitate
hydrotechnical investments
The representative of Wuprohyd
analyzed the plans for the construction or expansion of
hydrotechnical infrastructure in the largest Polish ports, which are
planned for the next few years, such as the construction of the
Central Port in Gdańsk, the Outer Port in Gdynia and Świnoujście
and the external bulk terminal in Świnoujście. The building of
infrastructure for the construction and servicing of investments
related to offshore wind energy: an installation port in Gdynia, an
installation and service port in Ustka or a service port in
Władysławowo were also taken into account.
- You should look
for solutions accelerating the implementation of projects at the
preparatory stage and at the execution stage, in which it is worth
using, inter alia, technologies accelerating construction - summed up
Piotr Pawłowski.
On the other hand, Zenon Górecki, president
of the management board of Idek Sp. z o.o., introduced the conference
participants to the design assumptions and technical solutions that
meet the needs of the market.
In the context of the shipyard
project, Safe emphasized that PPD differs from existing facilities in
that it allows the facility to be taken from land, brought into the
water, undocked, and if the facility cannot float by itself, it can
be transported.
Pontoon-dock blazes the trail.
"Nobody has done that yet"
- Pontoon-dock also
has an advantage that so far no one could boast of, because no one
can do it - said President Górecki. - The PPD can load a floating
object that will enter this platform, it will be lifted up and
transported to the land. From there it will go, for example, to the
hall, where you can take care of painting, renovation and
inspection.
He emphasized that the project brings an
additional ecological effect. The platform will be clean, as it is
used only for docking, undocking and transport. And usually painting
or cleaning is done on the docks.
The representative of the
Polski Rejestr Statków (Polish Ships Register, PRS), the director of
the Ship Division Grzegorz Pettke, who assessed the PPD project, also
took the floor.
- From the point of view of the versatility of
the PPD concept, flexibility should be particularly emphasized,
manifested not only in the wealth of variants of transport
applications (free configuration of the cargo space), but also the
creation of a wide field for the implementation of techniques for
automatic control of device parameters - said Grzegorz Pettke.
Due
to this fact, the concept has a chance of multi-directional
development - it can have many versions for specialized applications,
including for offshore wind energy, the Navy, as well as in
hydrotechnical or offshore construction.
- Moreover, the
development of this concept may provide the possibility of
cooperation of many specializations - from shipbuilding to
sophisticated computer techniques - added the director.
PRS
participates in the Floating Docking Platform project, in the first
stage considering and approving the classification documentation for
the assignment of the symbol of class. The role of the classification
society will also be supervision over the construction of the steel
structure of the pontoon, the production of materials and equipment,
supervision over the assembly of equipment and participation in
tests.
- The result of these activities will be the issuance
of appropriate documents and certificates for the platform's approval
for safe use - announced Pettke.
Important guests of the
conference were representatives of financial institutions. Iwona
Kasperowicz, the director of the Pomeranian Region of Bank
Gospodarstwa Krajowego, emphasized that the aspiration of the bank
and the Pomeranian region is the development of industry essential
for the Pomeranian region.
- And such is certainly the
shipbuilding industry, the development of ports and infrastructure -
said director Kasperowicz.
On the other hand, Joanna
Kwiatowska-Zawadzka from the Industrial Development Agency noted that
the institution has been supporting projects for 30 years, including
those in the shipbuilding industry.
- On the local market in
Gdynia, we can offer entrepreneurs investment and trading
instruments. When it comes to supporting this type of projects, we
are distinguished by high flexibility of the offer and adaptation to
the needs of a given entrepreneur. We have extensive experience in
structuring the very method of financing and security - summed up the
director of the Entrepreneur Service Center at Agencja Rozwoju
Przemysłu S.A.
The conference was held at the Centrum
Hotel in Gdańsk.
Let us add that for the implementation
of the floating docking platform project, Safe Shipyard received
funding from the National Center for Research and Development under
the Intelligent Development Operational Program 2014-2020 Division
1.1.1. Industrial research and development work carried out by
enterprises in the amount of 40 percent. eligible costs.
Project
title: "Development and demonstration of a unified technology
for the movement of particularly heavy, large-size floating and
hydrotechnical (offshore) structures between land and floating
docking or transport devices, using automated computing algorithms".
FLOATING DOCKING PLATFORM (PPD)
Basic
technical data:
Main dimensions:
Total length (with
fenders) Lc = 69.25 m,
Length between risers LPP = 69.00
m,
Structural width BK = 30.00 m,
Total width (with
fenders) BC = 30.25 m,
Side height at the towers H = 13.00
m,
Height to the working deck H1 = 5.00 m,
Maximum
draft for the dock function Tdmax = 11.00 m,
Maximum draft
for dock function Tpmax = 4.70 m,
Maximum draft
for the transport function Ttmax = 3.80 m,
Length of the
towers LW = 18.00 m,
BW towers width = 4.00 m,
Tower
height from the working deck HW = 8.00 m,
The width between the BR towers = 22.00 m,
The rebate distance
of 500 mm.
Other data:
Maximum lifting capacity for
the transport function Ptmax = 5000 t.
Maximum lifting
capacity for the dock function Pdmax = 3000 t.
Displacement
for a draft of 4.70 m DtmaxP = 9,568.00 t.
Displacement
for a draft of 11.00 m DtmaxD = 11 310.00 t.
Permissible
deck load (in SPMT platform lanes) q1max = 20t / m2.
Permissible
deck load q2max = 10t / m2