PGZ Stocznia Wojenna with a contract for the supply of equipment for frigates of the "Miecznik" program - MarinePoland.com
PGZ Stocznia Wojenna with a contract for the supply of equipment for frigates of the "Miecznik" program
Date of publication: 06.12.2023

PGZ Stocznia Wojenna (PGZ Naval Shipyard) cooperates with the Canadian company OSI Maritime Systems for the delivery of practical navigation and bridge systems (Integrated Navigation Bridge System INBS) for three multi-mission frigates built for the Polish Navy.


INBS is a Canadian-provided variant of the Integrated Navigation and Tactical System (INTS) required to support modern maritime operations. This solution is based on the Precision Integrated Navigation System for Warships (Electronic Precision Map Integrated Navigation System for Warships) delivered to the navies of NATO and allied countries.

PGZ Stocznia Wojenna and OSI Maritime Systems have been cooperating since 2018 in the supply of intelligent navigation and tactical systems for ships of the Polish Navy. Another area of activity is the transfer of foreign distribution systems to the defense industry. The Gdynia shipyard is currently an authorized service partner of OSI Maritime, thanks to which it can independently service and repair OSI systems throughout their entire period of use.


In the case of the safe Polish Armaments Group, which is provided with Thales for the supply of the Tacticos command and battle management system along with selected sensors that are available in the multi-mission devices of the "Miecznik" program frigates. The construction of first of three planned vessels, ORP Wicher, is underway.


Most recent